S.P.Q.R.
[ Новые сообщения · Участники · Правила форума · Поиск · RSS ]
  • Страница 1 из 1
  • 1
Форум клана S.P.Q.R. » Общий раздел » Общий форум » Building and construction
Building and construction
amellaamburryДата: Пятница, 26.07.2013, 23:01 | Сообщение # 1
Рядовой
Группа: Пользователи
Сообщений: 1
Репутация: 0
Статус: Offline

Infill development is the use of land within a built-up area for further construction, focusing on the reuse and replacement of obsolete or underutilized buildings and sites. Infill development presents unique challenges to a construction company. What will be done with the obsolete building's materials as it is demolished? http://project12.herobo.com Are there any asbestos issues to be addressed? Is the existing water / sewer / power infrastructure sufficient to support the new building's operations? How do you minimize and mitigate interruption to the operations of neighboring businesses?
The Pioneer 360 Business Center is a dramatic three-building, 1.16 Million SF business complex in Arlington, Texas that was http://designdesign.comze.com constructed on a previously developed property in the midst of older retail and commercial building facilities. A major portion of the project was the demolition of an 800,000 SF abandoned mall that covered much of the property. As such, Pioneer 360 Business Center provides a case study on overcoming the challenges inherent to infill development.


http://bestbeton.netne.net
 
Форум клана S.P.Q.R. » Общий раздел » Общий форум » Building and construction
  • Страница 1 из 1
  • 1
Поиск:

Copyright MyCorp © 2024 Используются технологии uCoz